Affiliation:
1. School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, China
Abstract
A quicksand disaster through a borehole occurred in Longde coal mine. A lot of aeolian sand, the volume of which is between 310,000 m3 and 380,000 m3, has submerged into the underground space in about 70.5 h. The volume flux of quicksand cannot be calculated accurately by the empirical method. Based on the method of fluid mechanics, an all-purpose computing method for quicksand disaster through a borehole was proposed. The result shows that the inrush volume of sand into underground space was between 310,000 m3 and 350,000 m3, which was consistent with the actual result. To apply and popularize this method, the impact laws of water yield properties of an aquifer on the volume flux were discussed. The all-purpose computing method can be suitably used for the volume flux calculation of quicksand disaster through the borehole.
Funder
National Natural Science Foundation of China
Subject
Civil and Structural Engineering
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献