Study on the Freeze-Thaw Process of the Lining Structures of a Tunnel on Qinghai-Tibet Plateau with the Consideration of Lining Frost Damage

Author:

Yu Hong12ORCID,Zhang Kun3ORCID,Zhu Xiaoming4ORCID,Tian Zhizhuo3ORCID,Zhang Qinglong3ORCID

Affiliation:

1. Gansu Province Highway Traffic Construction Group Co., Ltd., Lanzhou 730030, China

2. State Key Laboratory of Frozen Soil Engineering, Northwest Institute of Eco-Environment and Resources, Chinese Academy of Sciences, Lanzhou 730000, China

3. Gansu Provincial Transportation Research Institute Group Co., Ltd., Lanzhou 730000, China

4. Gansu Province Transport Planning Survey & Designing Institute Co., Ltd., Lanzhou 730030, China

Abstract

In seasonally frozen ground, there are many frost problems in highway road tunnel after its excavation due to the heat exchange between the cold air and lining structure inside the tunnel. To mitigate these frost-related damages, thermal insulation layer is widely used at entrance and exit sections of the tunnel. In this study, a coupled mathematical model of heat, moisture, and stress was built for tunnels in seasonally permafrost regions. Then, based on the field-observed air temperature inside a roadway tunnel at Altun Mountain on the Qinghai-Tibet Plateau (QTP), seasonal freeze-thaw process of the surrounding rocks (SR) and lining structures were numerically investigated with the consideration of insulation methods: without insulation (WTIL) and laying the insulation layer on the inner surface of the second lining structure (STIL). Combined with the principle of Miner damage accumulation, the stress regimes of the lining structures of tunnel were investigated in WTIL and STIL. The results show that there was a significantly thermal disturbance of the SR after the tunnel excavation. In the 5th year of the operation period, the maximum seasonal freeze depth (MSFD) of the SR can reach 1.6 m at the vault of the arch and that at the inverted arch was only 1.0 m due to the pavement inside the tunnel. Then, both the absolute maximum value of the maximum principal stress (MAPS) and minimum principal stress (MIPS) in cold season were bigger than those in warm season comparing the value of the stress filed of the lining structure. In the same way, both the MAPS and MIPS of the lining structure in WTIL are bigger than those in STIL in numerical simulation. The positions of the maximum tensile stress of the primary lining structure in STIL and WTIL were inverted arch. For the lining structures, the greater tensile stress was generally harmful. Thus, the inverted arch of the tunnel should be laid on the insulation layer.

Funder

Department of Transportation of Gansu Province

Publisher

Hindawi Limited

Subject

General Engineering,General Materials Science

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3