Abstract

Predicting and controlling the collapse of surrounding rock (especially broken rock masses) in underground chambers is an important topic in mining and geotechnical engineering. Based on an example, this paper introduces a case study of surrounding rock stability control technology in stope mining around abandoned areas. Based on on-site coring, mechanical properties of rock samples, and on-site grouting reinforcement technology, the TRT6000 advanced geological prediction system was used to predict the stability status of the surrounding rock of the underground chamber. AUTODYNA software was used to build a dynamic coupling model for numerical simulation prediction and optimization of blasting parameters and to reveal the dynamic variation in the surrounding rock. The dynamic failure process of the surrounding rock of the chamber before and after optimization of the blasting parameters is simulated, and the deformation characteristics and damage and acoustic emission characteristics of the surrounding rock are clearly shown. The surrounding rock failure first appeared around the surface of the underground chamber because of the high stress concentration around the surface of the chamber after blasting; with the interaction between the explosive gas and the rock mass, the damaged area further propagated into the external rock, eventually leading to a large damage area. At the same time, there is a large tensile failure in the rock, resulting in expansion and rupture around the underground chamber. Finally, the 3D laser scanning method is used to verify the superiority of the optimized blasting initiation sequence. The new edge hole detonation sequence can effectively improve the blasting vibration and successfully control the further damage of the surrounding rock of the underground chamber, thus proving the edge hole drug pack. Moreover, the initiation mode of the delay stage of the side hole charge is determined. This study provides a useful reference for the stability control of surrounding rock in mining in mining areas.

Funder

Natural Science Foundation of Hunan Province

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3