Scheduling and Common Due Date Assignment on a Single Parallel-Batching Machine with Batch Delivery

Author:

Gong Hua1ORCID,Zhang Biao1,Peng Wuliang1

Affiliation:

1. School of Science, The Key Laboratory of Liaoning Province for Advanced Manufacturing Technology and Equipment, Shenyang Ligong University, Shenyang 100159, China

Abstract

We consider a single parallel-batching machine scheduling problem with delivery involving both batching scheduling and common due date assignment. The orders are first processed on the single parallel-batching machine and then delivered in batches to the customers. The batching machine can process several orders at the same time. The processing time of a production batch on the machine is equal to the longest processing time of the orders assigned into this batch. A common due date for all the orders in the same delivery batch and a delivery date for each order need to be determined in order to minimize total weighted flow time. We first prove that this problem is NP hard in the strong sense. Two optimal algorithms by using dynamic programming are derived for the two special cases with a given sequence of orders on the machine and a given batching in the production part, respectively.

Funder

National High Technology Research and Development Program of China

Publisher

Hindawi Limited

Subject

Modeling and Simulation

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3