Publisher
Springer Science and Business Media LLC
Subject
Health, Toxicology and Mutagenesis,Pollution,Environmental Chemistry,General Medicine
Reference120 articles.
1. Abbasi S, Taghizade K, Noorzai E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. J Constr Eng Manag 146:04020143
2. Abd El-Razek M, Bassioni H, Mobarak A (2008) Causes of delay in building construction projects in Egypt. J Constr Eng Manag 134:831–841
3. Abdi A, Abdi A, Fathollahi-Fard AM, Hajiaghaei-Keshteli M (2021) A set of calibrated metaheuristics to address a closed-loop supply chain network design problem under uncertainty. Int J Syst Sci Oper Logist 8:23–40
4. Abioye OF, Dulebenets MA, Pasha J, Kavoosi M (2019) A vessel schedule recovery problem at the liner shipping route with emission control areas. Energies 12
5. Adom PK, Kwakwa PA, Amankwaa A (2018) The long-run effects of economic, demographic, and political indices on actual and potential CO2 emissions. J Environ Manag 218:516–526
Cited by
59 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献