Author:
Rostami Mohammad,Mohammadi Milad
Publisher
Springer Science and Business Media LLC
Reference59 articles.
1. Abedi M, Seidgar H (2016) A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates. Int J Serv Op Manag 23(2):135–152
2. Ahmadizar F, Farhadi S (2015) Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs. Comput Oper Res 53:194–205
3. Bachtenkirch D, Bock S (2022) Finding efficient make-to-order production and batch delivery schedules. Eur J Oper Res 297(1):133–152
4. Basir SA, Mazdeh MM, Namakshenas M (2018) Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system. Comput Ind Eng 126:217–231
5. Cakici E, Mason SJ, Geismar HN, Fowler JW (2014) Scheduling parallel machines with single vehicle delivery. J Heuristics 20(5):511–537