Site Measurement and Study of Vertical Freezing Wall Temperatures of a Large-Diameter Shield Tunnel

Author:

Hu Jun1ORCID,Liu Wenbo2,Pan Yutao3ORCID,Zeng Hui4

Affiliation:

1. Associate Professor, College of Civil Engineering and Architecture, Hainan University, Haikou 570228, China

2. M.Sc. of Geotechnical Engineering, College of Civil Engineering and Architecture, Hainan University, Haikou 570228, China

3. Research Fellow, Department of Civil and Environmental Engineering, National University of Singapore, Singapore 119576

4. Professor, College of Civil Engineering and Architecture, Wuyi University, Jiangmen 529020, Guangdong Province, China

Abstract

When a large-diameter shield tunnel boring machine enters or exits a tunnel, the newly exposed tunnel face is prone to instability and water seepage. In order to prevent collapse of the tunnel face, local ground improvement can be used until the permanent tunnel lining can be installed. The tunnel launching project of the Nanjing Metro Line 10 cross-river tunnel had a high stability requirement for the entry and exit phases. To this end, this project used a combination of cement treatment and ground freezing methods. In this project, field measurement of the vertical freezing improvement of the large-diameter shield tunnel was carried out. The temperature distribution and ground surface deformation of the vertical frozen soil wall at the end of the tunnel during the active freezing and maintenance freezing periods were analyzed in detail. The result shows that the surface settlement and seepage were successfully controlled by the combined cement treatment and ground freezing. On the other hand, the combination of cement treatment and ground freezing helps to control the freezing-induced heaving. The hydration heat in improved ground leads to an increase in ground temperature and this leads to additional freezing duration. It was examined that the frozen soil wall and the enclosure structure were in a good cementation condition. These measured values provide guidance on the timing of the shield departure. The project results confirmed that instability and water permeation did not occur in the tunnel face during the subsequent excavation.

Funder

Natural Science Foundation of Hainan Province

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3