Numerical Analysis of Shield Tunnelling Breakthrough Working Shaft by Artificial Ground Freezing Method under Extreme Conditions Considering Phase Change Latent Heat
-
Published:2023-03-13
Issue:6
Volume:13
Page:3651
-
ISSN:2076-3417
-
Container-title:Applied Sciences
-
language:en
-
Short-container-title:Applied Sciences
Author:
Deng Shengjun12ORCID,
He Yang1,
Yang Mingqi1,
Zhou Feng1,
Liu Heng1,
Zhu Rui1,
Wan Zhihui1ORCID
Affiliation:
1. Department of Underground Engineering, Nanjing Tech University, Nanjing 210009, China
2. Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Abstract
The artificial ground freezing method has been widely used in shield tunneling breakthrough working shafts. The freezing effect was mainly considered in the previous research, and the heat generation of the shield machine was not considered, which has great influence in actual engineering. In this paper, a coupling calculation model, considering phase change latent heat, is establishes that by containing the freezing process and heat generation of the shield machine, the model is verified. A numerical simulation is carried out for several working conditions that may occur in actual projects, and the following conclusions are obtained. Although the heat dissipated by the normal tunneling of the shield machine will melt the frozen soil curtain that originally meets the design requirements, the thickness of the frozen soil curtain after melting cannot reach the initial design, though it is still within the safe range. In the process of a continuous rotation working condition, the bottom and sides of a cup-shaped frozen soil curtain are partially melted in the early 6 day stay of the shield machine, and the thickness is reduced to a relatively stable value of 0.8 m. In a temporary shutdown working condition, when the contact surface temperature between the shield machine shell and the frozen soil drops to −12 °C after almost 4 days of shutdown, the shield machine may not keep tunneling forward due to the freezing effect. The research results will benefit the freezing design and management of the shield tunneling breakthrough working shaft under extreme conditions.
Funder
National Natural Science Foundation of China
Natural Science Foundation of Jiangsu Province
Key Laboratory of Soft Soils and Geoenvironmental Engineering (Zhejiang University), Ministry of Education
Opening Project of Tunnel and Underground Engineering Research Center of Jiangsu Province
Postgraduate Research & Practice Innovation Program of Jiangsu Province
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference23 articles.
1. A literature review on properties and applications of grouts for shield tunnel;He;Constr. Build. Mater.,2019
2. Development and prospects of tunnels and underground works in China in recent two years;Hong;Tunn. Constr.,2017
3. Application of Artificial Freezing Method in Deformation Control of Subway Tunnel;Li;Adv. Mater. Sci. Eng.,2022
4. Engineering difficulties and key technologies for underwater shield tunnel in complex ground;Tang;J. Eng. Geol.,2021
5. Finite element study on temperature field of subway connection aisle construction via artificial ground freezing method;Fu;Cold Reg. Sci. Technol.,2021
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献