Affiliation:
1. Nanjing Forestry University
2. Wuyi University
3. Changshu Institute of Technology
Abstract
There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.
Publisher
Trans Tech Publications, Ltd.
Reference9 articles.
1. Gong Xiaonan, et al. 2008. Foundation Treatment Handbook. Beijing: China building industry Press.
2. Wang Mengshu, et al. 2010. Tunneling and Underground Engineering Technology in China. Beijing: China Communications Press.
3. Zhang Fengxiang, Fu Deming, Yang Guoxiang. 2005. Construction Manual of Shield Tunnel. Beijing: China Communications Press.
4. Edited by Shanghai Society of Civil Engineering & Shanghai Tunnel Engineering Co., Ltd. Large Diameter Tunnel and Urban Rail Transit Engineering Technology: Proceedings of 2005 Shanghai International Forum on Tunneling [M]. Shanghai: Tongji University Press, (2005).
5. Hu Jun, Yang Ping, et al. Study on Numerical Simulation of Cup-shaped Horizontal Freezing Reinforcement Project near Shield Launching. International Workshop on Architecture, Civil and Environmental Engineering (ACEE 2011). 2011, 4.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献