Evaluation Of Hydraulic Fracture Performance in a Complex Stress Environment in Pakistan

Author:

Shaoul J.1,Boucher A.1,Park J.1,Tkachuk I.1,Makos M.2,Gorniak M.2,Wahab I.2,Akhtar J.2,Hussain M.2,Koprianiuk M.3,Sirati M.4

Affiliation:

1. Fenix Consulting Delft, Delft, Netherlands

2. POGC Pakistan Branch - Orlen S.A., Islamabad, Pakistan

3. POGC Warsaw Branch - Orlen S.A., Warsaw, Poland

4. Pakistan Petroleum Limited, Islamabad, Pakistan

Abstract

Abstract Propped fracture stimulation of gas wells has a long history of both successes and failures in Pakistan. The operator is actively developing tight gas reservoirs which include the Cretaceous Pab Formation. In recent years, this field has been subjected to an intense drilling and stimulation program with the objective to increase gas production from the tight Pab sandstone. One significant issue is the highly complex geo-mechanical situation, due to strike-slip stress regime which leads to very high fracturing pressures and the potential for fracture growth both vertically and horizontally. This paper is a case study of the evolution of propped fracturing strategy in an existing gas field, looking in detail at 4 wells that have been stimulated over the last seven years. In addition to analyzing the fracture treatment data, the pre- and post-frac welltest and long-term production data are also analyzed to better understand the fracture performance and the issues that affect post-fracture performance in a reservoir with such high stresses and normal (or depleted) reservoir pressure. The analysis uses an integrated approach, with history matching of both the fracture treatment data and the pre- and post-frac welltests and long-term production. The basis of the integrated approach is a reservoir description with one set of permeabilities that is used for both types of analysis, to ensure that the fracture analysis results and reservoir simulation results are consistent with each other. The fracture treatments in these four wells all share a pattern of very high closure stress gradients (close to overburden gradient), low fluid efficiency and a significant risk of screenout. Post-fracture production is close to expectation in most of the wells, although there are issues with the initial post-frac performance during the cleanup period, consistent with the effect of multi-phase non-Darcy flow. Resin Coated Proppant (RCP) was used in two of the wells, and may have had a negative effect on the initial production (choke or mechanical skin effect) as described in a previous publication by the authors (Shaoul, 2020). Two of the wells were vertical and two were deviated, which also has an effect on the post-fracture performance. There are very few published case studies of propped fracture stimulation from Pakistan, which has a unique and difficult geo-mechanical situation. This paper also compares the hydraulic fracturing results in Pakistan with a few other locations around the world where similar behavior has been seen, to give a better understanding of what can be done to improve hydraulic fracturing in these difficult reservoirs, either by trying to prevent some problems that can be avoided and by accepting that some problems are inherent in such a reservoir can only be partially mitigated by changing fracture design style and fracture design goals.

Publisher

SPE

Reference14 articles.

1. Abdrazakov, Dmitriy, Bolyspayev, Nurlan, Voigtlaender, Gernot, Nauruzov, Talgat, and AsfandiyarBigeldiyev. "Fracturing in a Tectonically Stressed Area under Anomalously High Gradients."Paper presented at the SPE Hydraulic Fracturing Technology Conference and Exhibition, The Woodlands, Texas, USA, January 2018. doi: https://doi.org/10.2118/189896-MS

2. Barree, R. D., Cox, S. A., Gilbert, J. V., and M.Dobson. "Closing the Gap: Fracture Half Length from Design, Buildup, and Production Analysis."Paper presented at the SPE Annual Technical Conference and Exhibition, Denver, Colorado, October 2003. doi: https://doi.org/10.2118/84491-MS

3. Boucher, Andrew, Shaoul, Josef, Tkachuk, Inna, Rashdi, Mohammed, Bahri, Khalfan, and CornelisVeeken. "Improving Proppant Placement Success in Horizontal Wells in Layered Reservoirs in the Sultanate of Oman."Paper presented at the SPE Annual Technical Conference and Exhibition, Dubai, UAE, September 2021. doi: https://doi.org/10.2118/205919-MS

4. Casero, A., and M.Rylance. "The Unconventional Unconventionals: Tectonically Influenced Regions, Stress States and Casing Failures."Paper presented at the SPE Hydraulic Fracturing Technology Conference and Exhibition, The Woodlands, Texas, USA, February 2020. doi: https://doi.org/10.2118/199710-MS

5. Colombo, I., Fanello, G., Valzania, S., Isella, D., and L.Tealdi. "History Match and Reserve Evaluation of Hydraulically Fractured Wells: Low Permeability Field Case History."Paper presented at the SPE Annual Technical Conference and Exhibition, Denver, Colorado, USA, September 2008. doi: https://doi.org/10.2118/114219-MS

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3