1. Building MELCOR Input Deck of Chinshan Nuclear Power Station and Analyses of Station Blackout Sequence;Cheng,2014
2. Sensitivity Analysis of Ultimate Response Guideline for Maanshan Nuclear Power Plant with PCTRAN;Cheng,2015
3. Chiang, Y., Wang, J.R., Lin, H.T., Chen, H.C., Shih, C., 2015. Methodology Using MELCOR2.1/SNAP to Establish an SBO Model of Chinshan BWR/4 Nuclear Power Plant, NURETH-16.
4. Gauntt, R., Kalinich, D., Cardoni, J., Phillips, J., Goldmann, A., Pickering, S., Francis, M., Robb, K., Ott, L., Wang, D., Smith, C., St.Germain, S., Schwieder, D., Phelan, C., 2012. Fukushima Daiichi Accident Study (Status as of April 2012), SAND2012-6173.
5. The establishment of MELCOR/SNAP model of Chinshan nuclear power plant for ultimate response guideline;Hsu;Nucl. Eng. Des.,2017