1. Chen, C.H., Huang, K.C., Chen, S.W., Wang, J.R., Shih, C., Lin, H.T., Chiang, S.C., Liu, C.C., 2015. Assessment of station blackout mitigation strategy applying the ultimate response guideline to Maanshan PWR, NURETH-16.
2. Building MELCOR Input Deck of Chinshan Nuclear Power Station and Analyses of Station Blackout Sequence;Cheng,2014
3. Chiang, Y., Wang, J.R., Lin, H.T., Chen, H.C., Shih, C., 2015. Methodology using MELCOR2.1/SNAP to establish an SBO model of Chinshan BWR/4 Nuclear Power Plant NURETH-16.
4. The ultimate emergency measures to secure a NPP under an accidental condition with no designed power or water supply;Liang;Nucl. Eng. Des.,2012
5. Human performance evaluation: the procedures of ultimate response guideline for nuclear power plants;Liu;Nucl. Eng. Des.,2012