Subject
General Engineering,General Computer Science
Reference14 articles.
1. The impact of priority rule combinations on lateness and tardiness;Barman;IIE Transactions,1998
2. A neural networks approach for due-date assignment in a wafer fabrication factory;Chang;International Journal of Industrial Engineering,2003
3. Chang, P.-C., Hsieh, J.-C., & Liao, T.W. (2001). A case-based reasoning approach for due date assignment in a wafer fabrication factory. Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada.
4. Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory;Chang;Journal of Intelligent Manufacturing,2005
5. A fuzzy back propagation network for output time prediction in a wafer fab;Chen;Applied Soft Computing,2003
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献