Subject
General Engineering,General Computer Science
Reference17 articles.
1. The impact of priority rule combinations on lateness and tardiness;Barman;IIE Transactions,1998
2. A fuzzy back propagation network for output time prediction in a wafer fab;Chen;Applied Soft Computing,2003
3. A fuzzy-neural and multiple-bucket approach for estimating lot cycle time in a wafer fab with dynamic product mix;Chen;Computers & Industrial Engineering,2008
4. A tailored nonlinear fluctuation smoothing rule for semiconductor manufacturing factory scheduling;Chen;Proceedings of the Institution of Mechanical Engineers, Part I, Journal of Systems and Control Engineering,2009
5. A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory – A simulation study;Chen;International Journal of Innovative Computing, Information and Control,2008
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献