1. Lucko, G., Su, Y., (2014) Singularity Functions as New Tool for Integrated Project Management, in Hajdu, M., Skibniewski, M., Procedings of the Creative Construction Conference 2014, 21-24 June, 2014 Prague Czech Republic, pp 414-420, ISBN:978-963-269-434-4.
2. Kelley, J.E. Jr. , Walker, M.R., (1959) Critical-path planning and scheduling, Papers presented at the December 1-3, 1959, Procedings of the Eastern joint IRE-AIEE-ACM Computer Conference, p.160-173, December 01-03, 1959, Boston, Massachusetts.
3. Roy, G.B., (1959) Théorie des Graphes: Contribution de la théorie des graphes á l1 étude de certains problémes linéaries, Comptes rendus des Séances de l1 Acedémie des Sciences. séence du Avril 1959, s2437-2449, 1959.
4. Fondahl, J.W., (1961) A Non-Computer Approach to the Critical Path Method for the Construction Industry, technical report #9 1st ed 1961, 2nd ed 1962 Stanford University Department of Civil Engineering.
5. Application of a Technique for a Research and Development Program Evaluation;Malcolm;Operations Research,1959