Removing Constraints to Make Tasks Ready in Weekly Work Planning

Author:

Hamzeh Farook,Zankoul Emile,Sakka Fatima El

Publisher

Elsevier BV

Subject

Applied Mathematics

Reference18 articles.

1. Prebid and preconstruction planning process;Laufer;Journal of construction engineering and management,1993

2. If CPM is so bad, why have we been using it so long?;Koskela;22nd Annual Conference of the International Group for Lean Construction. Oslo, Norway,2014

3. Seppänen, O. (2009). “Empirical Research on the Success of Production Control in Building Construction Projects.” PhD, Helsinki University of Technology Espoo, Finland.

4. Goldratt, E.M. (1997). Critical Chain, North River Press. 246 pp.

5. Hajdu, M., and Malyusz, L. (2014) Modeling spatial and temporal relationships in network techniques. Procedia- Creative Construction Conference, volume 85, pp 193-205.

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3