1. Fondahl, J. W. (1962). A Non-computer Approach to the Critical Path Method for the Construction Industry, Technical Report #9. 2nd edition. Department of Civil Engineering, Stanford University, Stanford, CA., Available at: https://trid.trb.org/view/99661 on 05.20.2018 Accession number at https://trid.trb.org/: 00215272.
2. Complexity of minimum-dummy-activities problem in a PERT network;Krishnamoorty;Networks,1979
3. Fondahl, J. W. (1987). The history of modern project management: precedence diagramming method: origins and early developments. Proj. Manag. J., 18(2) June, pp. 33–36. [ISSN 1938-9507].
4. Théorie des Graphes: Contribution de la théorie des graphes á l1 étude de certains problémes linéaries;Roy,1959
5. The great negative lag debate;Douglas,2006