1. Chen, K.Q., Peng, S., Wu, W.G., et al., 2012. Model test of immersed tunnel element in towing tank in winds, waves and currents. In: Proc. Twenty-second Int. Offshore Polar Eng. Conf., pp. 831–836.
2. CCCC second flight engineering survey & design institute Co., Ltd. (CCCC SFES&DI), 2009. Geological investigation report on immersed tunnel of Hong Kong–Zhuhai–Macao Bridge in construction documents design phase. Guangzhou (in Chinese).
3. Design and Construction of Immersed Tunnel;Chen,2002
4. Immersed tunnel settlements–Parts 1: nature of settlements;Grantz;Tunn. Undergr. Sp. Technol.,2001
5. Immersed tunnel settlements–Parts 2: case histories;Grantz;Tunn. Undergr. Sp. Technol.,2001