1. Does protective capacity assist managers in competing along time-based dimensions?;Atwater;Production and Inventory Management Journal,1994
2. Simulation Based Evaluation of Drum-Buffer-Rope (DBR) Scheduling System under Shifting Bottleneck Conditions;Atwater,1997
3. A study of the utilization of capacity constrained resources in drum-buffer-rope systems;Atwater;Production & Operations Management,2002
4. Designing unbalanced lines—Understanding protective capacity and protective inventory;Blackstone;Production Planning & Control,2002
5. The role of work-in-process inventory in serial production lines;Conway;Operations Research,1988