1. “Development of a multi-agent- based distributed simulation platform for semiconductor manufacturing,”;Lin;Expert Systems with Applications,2011
2. “Review of job shop scheduling research and its new perspectives under Industry 4.0,”;Zhang;Journal of Intelligent Manufacturing,2019
3. “Two-stage, hybrid flowshop scheduling problem,”;Gupta;Journal of the Operational Research Society,1988
4. “A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility,”;Ruiz;European Journal of Operational Research,2006
5. “Simulation modeling of a dynamic job shop rescheduling with machine availability constraints,”;Li;Computers and Industrial Engineering,1998