1. BPSS: A scheduling support system for the packaging industry;Adler;Operations Research,1993
2. Aghezzaf, E.H., Artiba, A., Moursli, O., Tahon, C., 1995. Hybrid flowshop problems, a decomposition based heuristic approach. In: Proceedings of the International Conference on Industrial Engineering and Production Management, IEPM’95, Marrakech. FUCAM-INRIA, pp. 43–56.
3. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms;Alcaraz;Journal of the Operational Research Society,2003
4. New heuristics for no-wait flowshops to minimize makespan;Aldowaisan;Computers & Operations Research,2003
5. A review of scheduling research involving setup considerations;Allahverdi;OMEGA, The international Journal of Management Science,1999