Subject
Management, Monitoring, Policy and Law,Economic Geology,Development,Geography, Planning and Development
Reference177 articles.
1. Causes of delay in building construction projects in egypt;El-Razek;J. Constr. Eng. Manage.,2008
2. Accenture. (2015). Ready Or Not? Creating a world-Leading Oil and Gas Industry in Australia. Retrieved from https://www.accenture.com/in-en/_acnmedia/Accenture/Conversion-Assets/DotCom/Documents/Global/PDF/Dualpub_14/Accenture-Australia-LNG-Report.pdf.
3. Managing non-technical risk in exploration and production (e&p) projects: opportunity to leverage the ia process;Adekoya;36th Annu. Confer. Int. Assoc. Impact Assess. (IAIA16), Resilien. Sustain.,2016
4. Analysis of cost and schedule performance of international development projects;Ahsan;Int. J. Proj. Manage.,2010
5. The effects of construction delays on project delivery in nigerian construction industry;Aibinu;Int. J. Proj. Manage.,2002
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献