Abstract
AbstractConsideration is given to the heuristic solution of the resource leveling problem (RLP) in project scheduling with limited resources. The objective is to minimize the changes in the level of resource usage from period to period over the planning horizon of the project while keeping the project duration fixed. First, we present two novel greedy schedule algorithms for the RLP solution. The performance of the proposed algorithms are investigated as low-level hybrids in the context of three famous population-based heuristics namely,differential evolution(DE),genetic algorithm(GA) andparticle swarm optimization(PSO). Then, we additionally present two new high-level hybridization schemes (HS), referred to herein asparallelandserialHS respectively which combine DE, GA and PSO in a single hybrid solution algorithm. Detailed experimentation over known complex data sets measures the efficiency of the new hybrids. Statistical analysis employed rank the hybrids according to their solution efficiency. Moreover, comparisons between the developed best hybrid and commercial project management software show a substantial higher performance for the former over real-world construction projects.
Publisher
Research Square Platform LLC
Reference53 articles.
1. Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splitting;Alsayegh H;Autom Constr,2012
2. A simulated annealing hyperheuristic for construction resource levelling;Anagnostopoulos KP;Constr Manage Econ,2010
3. Optimal project duration for resource leveling;Atan T;Eur J Oper Res,2018
4. Scheduling subject to resource constraints: Classification and complexity;Blazewicz J;Discrete Appl Math,1983
5. Caramia M, Dell’ Olmo P (2006) Effective Resource Management in Manufacturing Systems: Optimization Algorithms for Production Planning. Springer-Verlag, London