1. Resource leveling in make-to-order production: Modeling and heuristic solution method;Ballestin;International Journal of Operations Research,2007
2. Heuristic methods for resource leveling problems;Christodoulou,2015
3. Optimizing resource leveling in construction projects;El-Rayes;Journal of Construction Engineering and Management,2009
4. Gurobi Optimization Inc., 2015. Gurobi optimizer reference manual. http://www.gurobi.com.
5. Packing method for resource leveling (PACK);Harris;Journal of Construction Engineering and Management,1990