Author:
Alsayegh Hadeel,Hariga Moncer
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference19 articles.
1. Optimal resource leveling using non-serial dynamic programming;Bandelloni;European Journal of Operational Research,1994
2. Resource leveling in construction by optimization;Easa;Journal of Construction Engineering and Management,1989
3. Evolutionary resource scheduler for linear projects;Georgy;Automation in Construction,2008
4. Cost optimization for the multi-resource leveling problem with allowed activity splitting;Hariga;Journal of Construction Engineering and Management,2011
5. Precedence and Arrow Networking Techniques for Construction;Harris,1978
Cited by
24 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献