Affiliation:
1. American University of Beirut, 850 Third Avenue, 18th Floor, New York, NY 10022
Abstract
The need for the build-operate-transfer (BOT) approach in the development of infrastructure projects has risen in recent years, due to budgetary and financial constraints faced by the public sector in both developing and developed countries, tightened by the necessity to repair, maintain, and modernize the existing infrastructure facilities. Risk factors that influence the parties of a prospective BOT contract during the various phases of the contract are presented. In particular, the factors pertaining to the precontract stage and to the political, construction, commercial, and financial categories of possible risks are addressed. Integrated schemes assimilating the risks involved and the corresponding alleviation measures are offered.
Subject
Mechanical Engineering,Civil and Structural Engineering
Reference30 articles.
1. United Nations Commission on International Trade Law (UNCITRAL). Preparatory Measures. Privately Financed Infrastructure Projects, A/cn.9/438/Add3, Chapter V, 30th session, Vienna, Austria, 1997.
2. Political Risks: Analysis of Key Contract Clauses in China's BOT Project
3. Evaluation and Management of Political Risks in China's BOT Projects
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献