Mailyan Alexander,Afanasiev Grigoriy,Antoniadi Diana,Petrosyan Rima
Abstract
Abstract
In the complex development of urbanized areas, construction objects differ in spaceplanning and design solutions, construction volume, total area, and cost of construction. In this regard, in the construction of a facility complex, an important factor is the rational choice of the sequence of facility construction to ensure the optimal duration of construction of the entire complex. This problem is solved by the method of organizational and technological modeling, taking into account the availability of a sufficient amount of resources necessary for the parallel construction of several objects simultaneously. The erection of the construction object includes the underground part, the above-ground part, roofing and finishing construction work, which can be organized into rhythmic specialized flows at individual worksites. This allows you to reduce the duration of the construction of each facility and complex as a whole, as well as to determine the temporary reserves and use them to reduce construction time and optimal provision of material and financial resources. The methods of organizational and technological modeling solve the problem of choosing the optimal sequence of work during the construction of a facility complex to reduce construction time. With limited resources, there is an alternative to attracting additional resources or increasing the overall construction time.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献