Formation of optimal performance of works during establishment of the complex of objects optimal sequence of establishing objects complex building

Author:

Mailyan Alexander,Afanasiev Grigoriy,Antoniadi Diana,Petrosyan Rima

Abstract

Abstract In the complex development of urbanized areas, construction objects differ in spaceplanning and design solutions, construction volume, total area, and cost of construction. In this regard, in the construction of a facility complex, an important factor is the rational choice of the sequence of facility construction to ensure the optimal duration of construction of the entire complex. This problem is solved by the method of organizational and technological modeling, taking into account the availability of a sufficient amount of resources necessary for the parallel construction of several objects simultaneously. The erection of the construction object includes the underground part, the above-ground part, roofing and finishing construction work, which can be organized into rhythmic specialized flows at individual worksites. This allows you to reduce the duration of the construction of each facility and complex as a whole, as well as to determine the temporary reserves and use them to reduce construction time and optimal provision of material and financial resources. The methods of organizational and technological modeling solve the problem of choosing the optimal sequence of work during the construction of a facility complex to reduce construction time. With limited resources, there is an alternative to attracting additional resources or increasing the overall construction time.

Publisher

IOP Publishing

Subject

General Medicine

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Reserves for intensification of technological processes in repair and construction production;CONSTRUCTION: THE FORMATION OF LIVING ENVIRONMENT: FORM-2022;2023

2. Structural Analysis of Labour Costs for the Construction of Buildings and Their Structural Elements;International Scientific Siberian Transport Forum TransSiberia - 2021;2022

3. Intensification of Timing of Construction Works Under Resource Constraints;Building Life-cycle Management. Information Systems and Technologies;2022

4. Risks and reliability assessment of construction processes;E3S Web of Conferences;2021

5. The branch and bound method applied to the construction of residential quarters;Vestnik MGSU;2021-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3