Abstract
High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional – the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献