Abstract
Abstract
The features of the repair and construction work during the overhaul of buildings are reflected in the development of organizational and technological design documents, which include calendar plans. Organizational and technological models represent the basis for the development and calculation of calendar plans, as well as for determining resource requirements. They for prevention works, the order of their implementation, the nature of the relationship between individual works, reflecting the specifics of the selected technology for the production of work and the features of the simulated object. The scheduling of overhaul works is carried out on the basis of the developed methodology, which allows obtaining rational organizational and technological solutions with a low level of certainty of the initial information. To evaluate the final set of alternative options for calendar plans and choose the best option in accordance with the described methodology, it is recommended to use quasi metric methods. This allows us to lay the foundation for the rhythmic and coordinated work of all units involved in overhaul at the stage of scheduling, as well as to keep track of the possibility of ensuring timely completion of the planned work.
Subject
General Physics and Astronomy
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献