Optimization of inventory costs management in the construction enterprise

Author:

Rzepecki Lukasz

Abstract

Abstract During planning the execution of each construction project, the factors that may affect the effectiveness of its realization should be analyzed in detail. The costs of execution construction projects are significantly influenced by (apart from technical factors) decisions in the field of inventory management, among others, variability of environmental conditions, prices of construction products, the ability to acquire local suppliers, distance of transport, limited size of storage for construction products as well as the individual character of the project. In projects related to the buildings erection and other construction works, there are many logistical tasks in the area of supply in construction products, raw materials, equipment, as well as in the area of financial and information flow. Taking into account the large share of material costs, inventory management in the costs of projects realization and the high potential for their reduction, every enterprise operating in the construction industry should pay a great importance to the supply logistics sector. Determination of the size and delivery times of construction products, as well as the transport routes, storage and reloading locations are decision-making problems that are solved by management of both the enterprise and the construction projects. The paper presents a proposal for a methodology, which allows to determination and comparison of the inventory management costs in enterprise conducting parallel works on several construction sites. Mathematical models have been developed which simulate the functioning of supply logistics systems and allow, through their solution, to determination of the minimum logistics costs with optimal arrangements for the supply schedule (delivery volumes in subsequent periods of the project execution). This is the foundation for the selection of the optimal variant of a supply chain management. The practical application of the methodology proposed is illustrated using an example.

Publisher

IOP Publishing

Subject

General Medicine

Reference20 articles.

1. Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process;Tomczak;KSCE J Civ Eng,2018

2. Simulation Method for Scheduling Linear Construction Projects Using the Learning – Forgetting Effect;Rzepecki;MATEC Web Conf.,2018

3. Analysis of the Increase of Construction Cost in Urban Regeneration Projects;Apollo;Adv. Sci. Technol. Res. J.,2015

4. Zarządzanie logistyczne w przedsięwzięciach budowlanych;Sobotka;Górnictwo i Geoinżynieria,2005

5. Assessment framework for construction supply chain relationships: Development and evaluation;Meng;International Journal of Project Management,2010

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3