CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS

Author:

Al-Aidrous Al-Hussein Mohammed Hassan1,Hern Ng Jenn1,Rahmawati Yani2,Jahja Mohamad3,Yusof Khamaruzaman Wan1,Zawawi Noor Amila Wan Abdullah1,Utomo Christiono4,Raflis 5

Affiliation:

1. Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, Perak, Malaysia

2. Department of Architecture and Planning, Universitas Gadjah Mada, Yogyakarta, Indonesia

3. Department of Physics, Universitas Negeri Gorontalo, Gorontalo, Indonesia

4. Department of Civil Engineering, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia

5. Department of Civil Engineering, Universitas Trisakti, Jakarta, Indonesia

Abstract

The performance of any construction project is highly influenced by the efficient planning of materials among construction supply chain players. The improper planning for the construction project has been discussed recently in the literature, with a special focus on the logistic and material aspects. Completing a construction project within time and cost constraints is highly affected by the inventory management system. Such evidence proves the big impact of the inventory management system on construction performance. Derived from these arguments, the critical impact of the inventory and procurement system used at the construction site is definite. This research aims to examine the main factors that need to be considered when developing an inventory and procurement management system and classify the most influential and impactful factors. This research adopted a two-steps methodology, which started with an interview with construction experts then followed by a questionnaire survey targeting project managers and engineers from MRT Line 2 Tunneling infrastructure project in Malaysia. Exploratory Factor Analysis (EFA) was used for data analysis as well as the scatter plot of the mean and standard deviation analysis. The most critical factors affecting the inventory and procurement handling are related to the operation and management aspects. The top five impactful factors are communication between labor and management, information sharing, software usage on material tracking, purchasing plan, and construction progress. The research outcomes can be used to develop further mitigation plans in the early stages of infrastructure projects.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3