Abstract
In the literature on the scheduling of construction projects it is difficult to find a justification for adopting the criteria for evaluating work schedules based explicitly on the preferences of those who develop them. This article tries to fill this gap and provide information on the preferences of construction site managers for sustainable scheduling and organization of construction projects. The publication focuses on the views and needs of construction site engineering staff regarding methods of work organization, the need to reduce downtimes in the work of crews, the deadline for project realization and the selection of crews for tasks. This information was obtained on the basis of surveys conducted among managerial staff of various levels (74 people). The authors hope that the information provided in this publication will allow the creation of more reliable tools to support construction managers better adapted to their preferences and needs, and therefore more likely to be applied in practice.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Reference33 articles.
1. Definiowanie zrównoważonego budownictwa. Cz.1;Czarnecki;Mater. Bud.,2010
2. A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling
3. Better Practices of Project Management Based on IPMA Competences;Hermarij,2013
4. Metodologia Projektowania Realizacji Budowy;Jaworski,2009
5. Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献