Ameliorating time and cost control with project learning and communication management

Author:

Yap Jeffrey Boon HuiORCID,Skitmore Martin

Abstract

PurposeLegions of projects fail to attain their time and cost objectives due to ineffective coordination. This is often due to a lack of essential learning from projects because of insufficient communication and working experience. One of the key reasons why this occurs is that managers are unaware of what knowledge needs to be retained. In contrast with knowledge management research, which mostly focuses on the systems and processes for capturing, storing, and retrieval of knowledge, this paper investigates the nature of project communication and learning and their role on project time and cost control.Design/methodology/approachA stratified proportional purposive sampling approach was adopted in choosing the interview participants for the study. They are experienced industry practitioners working on building construction projects in Malaysia. Content analysis was then performed on the interview data. The identified variables were further validated by 11 industry experts from the three primary construction stakeholders.FindingsThe results of a series of 12 in-depth interviews with industry practitioners are provided to reveal the effective communication tools for sharing and learning in a project-based environment, the learning inducing situations involved, and the use of reusable project experiences to improve project time and cost control.Research limitations/implicationsA possible limitation of the study is its focus on a small group of Malaysian practitioners delimits the generalizability of the findings.Originality/valueA two-phase model with three-step project management process of input, tools, and output is developed from the Project Management Body of Knowledge (PMBOK) Guide as an aid for more effective knowledge reuse in project time and cost control in the future.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference123 articles.

1. Delay mitigation in the Malaysian construction industry;Journal of Construction Engineering and Management,2006

2. Impacts of design changes on construction project performance: insights from a literature review;Journal of Quantity Surveying and Construction Business,2016

3. Conceptual delay mitigation model using a project learning approach in practice;Construction Management and Economics,2008

4. Aggregation of factors causing cost overruns and time delays in large public construction projects: trends and implications;Engineering, Construction and Architectural Management,2017

5. Knowledge transfers and project-based learning in large scale infrastructure development projects: an exploratory and comparative ex-post analysis;International Journal of Project Management,2016

Cited by 28 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3