Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry

Author:

Parchamijalal Majid,Moradi Saeed,Zabihi Shirazi Mohsen

Abstract

PurposeClaim formation is a fact and a regular occurrence in construction industry projects and often leads to a waste of money and time for organizations. Organizations can, however, reduce and control claims by promoting an integrated claim management system and improving productivity in the results of the claims. Establishing a claim management office is one of the ways to help organizations achieve this.Design/methodology/approachBased on library research, expert opinion and analysis of organizations' contracts as case studies and identifying the root causes of the claim, this paper proposes a claim management office maturity model and determines its levels.FindingsThis paper proposes a claim management office maturity model and also determines its levels. The general structure of this model is based on three parameters: “characteristics of each level,” “requirements of each level” and “transition period of each level” in five levels, where the first level is the most basic level and level five is the highest level of the implementation of a claim management office in the organization.Originality/valueIt can be clearly emphasized that this research is one of the first research studies that has dealt with the issue of claim management office in the construction industry and has proposed the model of maturity and development of claim management office in the organization. The use of numerous and experienced experts in achieving the results and case organizations to develop this research has increased the value and credibility of this research. This study also helps to improve the level of claim management in construction industry organizations so that these organizations can implement each level of claim management maturity model in the organization according to their competence and need for claim management. And by implementing it correctly, solve or reduce the problems of claim management in the organization and their projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference36 articles.

1. Project maturity in organisations;International Journal of Project Management,2003

2. A study of construction claim management problems in Malaysia;Procedia Economics and Finance,2015

3. The use of maturity models in improving project management performance: an empirical investigation;International Journal of Managing Projects in Business,2014

4. The project management maturity model;Information Systems Management,2006

5. Identification, prioritization and management of construction project claims;Journal of Engineering, Project, and Production Management,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3