Improving project management “closeout” phase outcomes: evidence from a large general contractor in Iran using “X-inefficiency theory”

Author:

Mirzaee Ali Mohammad,Martek Igor

Abstract

PurposeOptimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues, potentially unfulfilled contractual obligations, performance claims and counter-claims, combined with consequently deteriorating stakeholder relationships, the management of closeouts is fraught with difficulties leading to suboptimal outcomes. This is particularly true where general contractor (GC) organizations do not have a claims management office (CMO) dedicated to improving such suboptimal clean-up outcomes. Thus, this study aims to develop a model by which CMOs’ may effectively manage the clean-up phase in an environment of closeout claims.Design/methodology/approachX-inefficiency theory was utilized as the theoretical lens guiding this study. The theory helps identify closeout strategies implemented by a GC, which manages completion claims through a CMO. Data were received and analyzed from a large GC, which served as the firm case study. In this case, managing the closeout completion claims was the main function of the CMO.FindingsThe average delay of closeout completion was four times greater than construction phase delays. The GC results highlighted the “economic destruction tsunami of projects,” as a root cause for these completion delays. Wrap-up activities under contract law are identified, including within the domains of statements of completion, project handover and debt settlement. Behavior strategies are also defined, including relational and contractual approaches. Moreover, a process for improving closeout claim performance is described, comprising project closeout identification, rational intra-firm behavior, closeout completion and program closeout practice.Originality/valueFindings from this work can significantly contribute in X-inefficiency theory in relation to how a decrease of X-inefficiency will lead to better closeout claim performance. It also offers practical insights into how best to minimize delayed closeout completion while providing valuable lessons for stakeholders in complex infrastructure projects. Further, a model is developed that may be utilized by owners, consultancies, designers and other contractor organizations in an effort to improve closeout claim performance.

Publisher

Emerald

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3