Estimating facilities maintenance cost using post-occupancy evaluation and fuzzy set theory

Author:

Alshibani Adel,Hassanain Mohammad A.

Abstract

Purpose The purpose of this paper is to introduce a new general approach for estimating the maintenance cost of constructed facilities. The proposed approach consists of four components, including: facility work breakdown structure; historical maintenance cost and cost contingency data of actual completed projects; feedback obtained from the post-occupancy evaluation (POE); and fuzzy set theory (FST) to define the uncertainty associated with the maintenance cost and cost contingency as an alternative approach to simulation. Design/methodology/approach Literature review of the existing methods used for estimating maintenance cost of constructed facilities was conducted to highlight the limitations of the existing methods and models. The paper then introduced a new approach in which the results obtained from POE are integrated with the estimator’s judgment in estimating maintenance cost of constructed facility. As a proof of concept, the developed approach is tested on a private school facility in the city of Khobar, Saudi Arabia. The application of the proposed approach in this case project demonstrates its applicability and features in comparison with the existing practice. Findings The application of the developed approach on a school case project demonstrated that the developed approach can provide a reliable facility maintenance cost estimate, narrow the uncertainties and vagueness associated with the estimated cost, and provide the estimator with the necessary information to conduct risk analysis with less effort, less computations and less complexity comparing with that provided by complex simulation. The results also showed that integrating POE in the estimating process can provide more accurate cost estimate with high level of confidence. Originality/value The paper presents a new approach for estimating facility maintenance cost. The developed approach introduced a new concept that assists maintenance contractors in preparing facility maintenance estimate with improved accuracy while satisfying the facility user’s needs. The proposed approach integrates the estimator’s judgment with POE to model the uncertainties associated with cost using FST as an alternative approach for complex simulation.

Publisher

Emerald

Subject

Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality

Reference27 articles.

1. Understanding project cost contingency – a survey,2005

2. Current and future pavement maintenance prioritization based on rapid visual condition evaluation;Journal of Transportation Engineering,2001

3. A neural network approach to risk assessment and contingency allocation;AACE International Transactions,2000

4. Chung, T. (2007), “Simulation-based productivity modeling for tunnel construction operations”, PhD dissertation, Department of Civil and Environmental Engineering, University of Alberta, Edmonton.

5. Monte Carlo analysis: ten years of experience;Cost Engineering,2001

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3