Dang Chau Ngoc,Le-Hoai Long
Abstract
Purpose
The purpose of this paper is to develop several predictive models for estimating the structural construction cost and establish range estimation for the structural construction cost using design information available in early stages of residential building projects.
Design/methodology/approach
Information about residential building projects is collected based on project documents from construction companies with regard to the design parameters and the actual structural construction costs at completion. Storey enclosure method (SEM) is fundamental for determining the building design parameters, forming the potential variables and developing the cost estimation models using regression analysis. Nonparametric bootstrap method is used to establish range estimation for the structural construction cost.
Findings
A model which is developed from an integration of advanced SEM, principle component analysis and regression analysis is robust in terms of predictability. In terms of range estimation, cumulative probability-based range estimates and confidence intervals are established. While cumulative probability-based range estimates provide information about the level of uncertainty included in the estimate, confidence intervals provide information about the variability of the estimate. Such information could be very crucial for management decisions in early stages of residential building projects.
Originality/value
This study could provide practitioners with a better understanding of the uncertainty and variability included in the cost estimate. Hence, they could make effective improvements on cost-related management approaches to enhance project cost performance.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference58 articles.
1. Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects;Canadian Journal of Civil Engineering,2002
2. Comparative accuracy of floor area, storey enclosure and cubic methods in preparing preliminary estimate in Nigeria;Journal of Building Appraisal,2011
3. Construction cost prediction for public school buildings in Jordan;Construction Management and Economics,1996
4. Predicting cost deviation in reconstruction projects: artificial neural networks versus regression;Journal of Construction Engineering and Management,2003
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献