1. American Institute of Architects (2007). Integrated Project Delivery: A Guide. In American Institute of Architects National and AIA California Council Sacramento, CA, 62.
2. Ballard, G. 2006, ‘Rethinking Project Definition in Terms of Target Costing’ In: 14th Annual Conference of the International Group for Lean Construction. Santiago, Chile, 1-. pp 77-89
3. Target Value Design: Current Benchmark;Ballard;Lean Construction Journal,2011
4. Ballard G. and Pennanen A., 2013. “Conceptual Estimation and Target Costing". Proceedings IGLC-21, July 2013, Fortaleza, Brazil.
5. G. Ballard, P. Reiser (2004). The St. Olaf College Fieldhouse Project: A Case Study in Designing to Target Cost, In:, Bertelsen, S. & Formoso, C.T,. Paper presented at the 12th annual conference of the International Group for Lean construction, Denmark.