Author:
Hosseinzadeh Farhad,Paryzad Behzad,Pour Nasser Shahsavari,Najafi Esmaeil
Abstract
Purpose
The optimization and tradeoff of cost-time-quality-risk in one dimension and this four-dimensional problem in ambiguous mode and risk can be neither predicted nor estimated. This study aims to solve this problem and rank fuzzy numbers using an innovative algorithm “STHD” and a special technique “radius of gyration” (ROG) for fuzzy answers, respectively.
Design/methodology/approach
First, it is the optimization of a fully fuzzy four-dimensional problem which has never been dealt with in regard to risk in ambiguous mode and complexities. Therefore, the risk is a parameter which has been examined neither in probability and estimableness mode nor in the ambiguous mode so far. Second, it is a fully fuzzy tradeoff which, based on the principle of incompatibility “Zadeh, 1973”, proposes that when the complexity of a system surpasses the limited point, it becomes impossible to define the performance of that system accurately, precisely and meaningfully. The authors believe that this principle is the source of fuzzy logic. Third, for calculating and ranking fuzzy numbers of answers, a special technique for fuzzy numbers has been used. Fourth, For the sake of ease, precision and efficiency, an innovative algorithm called the technique of hunting dolphins “STHD” has been used. Finally, the problem is very close to reality. By applying risk in ambiguous mode, the problem has been realistically looked at.
Findings
The results showed that the algorithm was highly robust, with its performance depending very little on the regulation of the parameters. Ranking fuzzy numbers using the ROG indicated the flexibility of fuzzy logic, and it was also determined that the most appropriate regulations were to ensure low time, risk and cost but maximum quality in calculations, which were produced non-uniformly based on the levels of Pareto answers.
Originality/value
The ROG and Chanas Fuzzy Critical Path Method as developed by other researchers have been used. Despite the increase in limitations, parameters can develop. The originality of this study with regard to evaluating the results of tradeoff combinatorial optimization is upon decision-making which has a special and highly strategic role in the fate of the project, with the research been conducted with a special approach and different tools in a fully fuzzy environment.
Subject
Computational Theory and Mathematics,Computer Science Applications,General Engineering,Software
Reference55 articles.
1. Using electimize to solve the time cost-tradeoff problem in construction engineering;Computing in Civil Engineering,2011
2. Multi-objective optimization of time-costquality using multi-colony ant algorithm;Asian Journal of Civil Engineering (Building and Housing),2007
3. Nondominated archiving multicolony ant algorithm in time–cost trade-off optimization;Journal of Construction Engineering and Management,2009
4. A robust optimization for damage detection using multi-objective genetic algorithm, neural network and fuzzy decision making;Inverse Problems in Science and Engineering,2019
5. Optimization of project time-cost trade-off problem with discounted cash flows;Journal of Construction Engineering and Management,2010
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献