A Development Model for Identifying the Uncertainty Sources and Their Impacts on Bridge Construction Projects

Author:

Atashgah Kayvan Mohammadi1ORCID,Ghousi Rouzbeh2ORCID,Abbasi Armin Monir3ORCID,Nasrabadi Abbasali Tayefi4ORCID

Affiliation:

1. Department of Civil Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran

2. School of Industrial Engineering, Iran University of Science and Technology I.U.S.T, Tehran, Iran

3. Civil Engineering Faculty, Payame Noor University, Tehran, Iran

4. Civil and Architectural Engineering, Fereshtegaan International Branch, Islamic Azad University, Tehran, Iran

Abstract

Bridge construction projects are rife with uncertainty because of their unique features, from execution of the work, time estimation, inspection and assessment to fund allocation. Therefore, a critical step is recognise and categorise the uncertainties associated in bridge building in order to meet project objectives in terms of quality, cost, schedule, environmental, safety, and technical indicators. Various models, however, have been created to detect and prioritise the uncertainty. One of the most commonly used approaches for dealing with uncertainty is the spherical fuzzy set. To formulate an issue, this technique uses a mathematical procedure. The analytic hierarchy process (AHP), on the other hand, is a computer technique that solves a complicated problem by breaking it down into numerous basic problems. A hybrid model based on spherical fuzzy sets and AHP (SAHP) can benefit from both approaches. This study proposes a SAHP based on group decision making (GSAHP) to prioritise the sources of uncertainty in bridge construction projects. Likewise, a modified algorithm is proposed for checking the consistency of the spherical fuzzy matrices. To show the model potential, a real case study is illustrated and evaluated. The model demonstrates its capabilities in modelling uncertainty under an environment with a number of unknown components. The findings reveal that the “delays” factor is of the highest, and the “project team conflicts” parameter is of the least importance. The research findings could be used by decision makers and managers to develop preventive measures.

Publisher

Riga Technical University

Subject

Building and Construction,Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3