Abstract
PurposeThe study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.Design/methodology/approachThe study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.FindingsThe findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.Research limitations/implicationsOnly road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.Practical implicationsThere is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.Originality/valueThe study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.
Subject
Management Science and Operations Research,Civil and Structural Engineering
Reference46 articles.
1. Financial-related causes contributing to project delays;Journal of Retail and Leisure Property,2009
2. Aggregation of factors causing cost overruns and time delays in large public construction projects: trends and implications;Engineering, Construction and Architectural Management,2017
3. African Development Fund (2013), “Project completion report. Masulira – Nkhotakota road project, Malawi”, available at: https://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/ADF-BD-IF-2007-58-EN-MALAWI-PCR-ROAD-PROJECT.PDF (accessed October 2017).
4. Using system dynamics modelling principles to resolve problems of rework in construction projects in Nigeria;Journal of Construction Project Management and Innovation,2015
5. Delay and cost overrun in infrastructure projects in Jordan;Procedia Engineering,2017
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献