Author:
Abdul-Rahman Hamzah,Takim Roshana,Min Wong Sze
Publisher
Springer Science and Business Media LLC
Subject
Tourism, Leisure and Hospitality Management,Finance,Business and International Management
Reference29 articles.
1. Abdul-Rahman, H., Berawi, M.A., Berawi, A.R., Mohamed, O., Othman, M. and Yahya, I.A. (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management 132 (2): 125–133.
2. Ahmed, S.M., Azhar, S., Kappagntula, P. and Gollapudial, D. (2003) Delays in Construction: A Brief Study of the Florida Construction Industry, Proceeding of the 39th Annual ASC Conference, Clemson University, Clemson, SC, pp. 257–266.
3. Aibinu, A.A. and Jagboro, G.O. (2002) The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management 20: 593–599.
4. Alaghbari, W. (2005) Factors affecting construction speed of industrialized building system in Malaysia. Master's thesis, University Putra Malaysia, Serdang.
5. Alaghbari, W.E., Kadir, M.R.A., Salim, A. and Ernawati (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management 14 (2): 192–206.
Cited by
41 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献