Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example

Author:

Omar Hany,Mahdjoubi Lamine

Abstract

PurposePoor performance remains a challenge for the construction industry worldwide. One of the key performance indicators of the construction industry is the timely delivery of projects. Despite the recent methodological and technological advances in the field, project-overrun remains a significant challenge for the industry. This paper seeks to propose practical solutions that allow overcoming the challenges and promote the opportunities for improving the performance of the construction projects in Dubai.Design/methodology/approachThis study focussed on the construction projects in Dubai; therefore, this research adopted a sequential mixed approach in two stages. The first stage involved face-to-face interviews with seven carefully selected construction professionals. Their answers were analysed to provide with the literature study “the informed-basis for the development of the online questionnaire”. The second stage involved an online survey administrated to 425 carefully selected construction organisations working in Dubai. Accordingly, a meticulous analysis for the prime causes of project overruns has also been undertaken. This analysis assisted proposing the most suitable solutions-based technologies that enabled alleviating overruns in the construction projects.FindingsThe findings revealed that, there was a consensus agreement on the formidable opportunities for improving the performance of the construction industry in general and in particular in Dubai. These opportunities are intrinsically linked with the adoption of the latest technologies such as building information modelling, augmented reality, virtual reality and the artificial intelligence (AI). Whereas, adopting AI has already assisted two public authorities to release No Objection Certificates and work permits effectively within one day instead of 14 working days, which has saved 90% of the time and cost. Likewise, adoption of the AI has assisted delivering the construction project with a 9% of time saving and a 6% of cost saving due to embracing an automated system that enabled them to instantly detect and report the delays, once occurred.Research limitations/implicationsThe main limitation of this study is that the study was limited to the construction industry in the Emirate of Dubai. Therefore, future research could target the whole United Arab Emirates construction industry to propose the practical solution on the country level.Practical implicationsThe literature study is replete with solutions, which tend to be theoretical more than practical. Therefore, the proposed practical recommendations will significantly assist the construction industry to improve its suboptimal performance to rescind the sovereignty of the irrelevant involvements. The research recommended establishing independent entity to lead the change in the construction industry; this entity will have the power of enacting rules and legislations. Furthermore, this independent entity will have the power and authority of dictations and impose sanctions on the non-committed organisations that are reluctant to adopt the recommended technologies and approaches.Originality/valueBased on the findings of the study, this paper draws a road map for the construction industry by determining practical solutions for improvements starting with an establishment of an independent authority that selects and tests the most appropriate technologies and approaches to contribute to performance improvements.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference101 articles.

1. Aggregation of factors causing cost overruns and time delays in large public construction projects: trends and implications;Engineering, Construction and Architectural Management,2017

2. Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects;Engineering, Construction and Architectural Management,2019

3. The professionals' perspective on the causes of project delay in the construction industry;Engineering, Construction and Architectural Management,2017

4. Digital twin-based progress monitoring management model through reality capture to extended reality technologies (DRX),2021

5. Analyzing the impact of negative cash flow on construction performance in the Dubai area;Journal of Management in Engineering,2012

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3