1. Basili, V.R. (1999),Experimentation Using the Goal/Question/Metric Paradigm: Studies on Preventing and Detecting Defects, Draft of Chapter 4, from Basili Notes at Univ. of Maryland, available at: www.cs.umd.edu/users/mvz/mswe609/book/chpater4.pdf (accessed 15 December 2007).
2. Carnegie Mellon University Software Engineering Institute (2010),CMMI for Development, Version 1.3(pdf) CMMI‐DEV, November, available at: www.sei.cmu.edu/library/abstracts/reports/10tr033.cfm (accessed 16 February 2011).
3. Daskalantonakis, M.K. (1992), “A practical view of software measurement and implementation experiences with Motorola”,IEEE Transaction on Software Engineering, Vol. 18 No. 11, November.
4. Quality management initiatives in Europe: An empirical analysis according to their structural elements
5. Hafeez, K. (2007), “TQM and organisation learning: a conceptual and field study of European companies”,International Journal of Quality and Standards, Vol. 1 No. 1, pp. 276‐302.