Key driving factors of cost overrun in highway infrastructure projects in Nigeria: a context-based perspective

Author:

Mahmud Abba Tahir,Ogunlana Stephen O.,Hong W.T.

Abstract

Purpose Extensive research towards identifying the attributable cost overrun factors globally has been conducted predominantly from a survey-oriented perspective, which disregard the contextual basis on which these triggers manifest. This study aims to explore the driving factors of cost overrun in highway projects, specific to the Nigerian context. Design/methodology/approach The research used a context-based approach to seek project stakeholders’ perspectives on the key drivers of cost overrun in highway projects in Nigerian. Semi-structured interviews were conducted with client, contractor and consultant organisations involved in the provision of highway infrastructure projects in Nigeria. The collected data was analysed using a developed coding framework grounded on a case study approach, principles of inductive thematic analysis and saliency analysis to identify the key drivers. Findings Findings from the analysis identified triggers from macroeconomic, societal, leadership and project management perspectives with synergistic relationships with each other based on prevalence and significance. Among the key triggers is a delay in work progress, political instability, adverse weather, social issues, delay in progress payment to contractors and modification of project scope. In conclusion, the triggers of cost overrun in highway projects are contextually driven by the complex nature of the project management, societal, macroeconomic and leadership triggers specific to the Nigerian context. Research limitations/implications The research was limited to only highway infrastructure projects in Nigeria. Furthermore, the findings are based on a small sample size, and thus, caution must be taken before applying the outcome of this study in a generalised way to other contexts. Practical implications Practically, the stakeholders i.e. client, contractors and consultants should acknowledge the contextual circumstances in which each of the triggers takes place, which will aid in developing pragmatic measures and make the right decisions towards addressing these triggers during any highway construction project in Nigeria and enhance the chances of project success. Originality/value The context-based approach applied in this study is expected to provide a new insight in understanding the triggers of cost overruns, especially in highway projects in Nigeria and indeed other developing countries with similar governance characteristics

Publisher

Emerald

Subject

General Engineering

Reference80 articles.

1. Public-private financed road infrastructure development in north-central region of nigeria;Journal of Management and Sustainability,2015

2. Spotlight on construction cost overrun research: superficial, replicative and stagnated,2015

3. Mapping the causes of time, cost overrun and quality shortfall in Egyptian public highway projects;European and Business Management,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3