Exploring the key risk factors impeding the performance of highway construction projects: an evidence from Nigeria

Author:

Akoh Sani Reuben,Sun Ming,Ogunlana Stephen,Mahmud Abba Tahir

Abstract

Purpose Construction projects, and particularly highway infrastructures, are known to be major contributors to the socio-economic growth of developing countries. However, these types of projects are infamous for being highly risky due to the interplay of numerous risk factors. This study aims to explore the key risk factors impacting on the performance of highway infrastructure projects in Nigeria from the contextual viewpoint of key industry stakeholders. Design/methodology/approach Qualitative data was collected using semi-structured interviews. Specifically, 17 in-depth expert interviews were conducted with experienced stakeholders in the highway sector of the Nigerian construction industry. The collected data was transcribed and analysed using an established coding framework (grounded on case study approach, principles of thematic analysis and saliency analysis). Findings Overall, 17 key risks were identified from the data analysis process, and 6 risks were recognised as the most significant, based on the combination of prevalence of occurrence and significance of the coded information. The six top risks were: change in government, corruption, cost of construction materials, inflation, project funding issues and construction project delay. However, the first two of these risks (change in government and corruption) are politically related, which is specific and unique to the setting of Nigeria and thus might be seen as discouraging indicators that could have an impact on attracting foreign investors/contractors to Nigeria. Originality/value The study addressed the gap related with identifying context-specific risk factors impeding the performance of highway projects in Nigeria from the viewpoints of industry experts. It is expected that the findings will provide a better insight into the various risk factors and thus aid relevant policymakers to provide context-specific mitigating strategies.

Publisher

Emerald

Reference68 articles.

1. Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP;Journal of Construction Engineering and Management,2010

2. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects;Journal of Civil Engineering and Management,2017

3. Evaluating why quantity surveyors conflict with collaborative project delivery system,2018

4. Exploratory study of ‘costing collaboratively’ in the UK construction industry,2019

5. Latent geotechnical pathogens inducing cost overruns in highway projects;Journal of Financial Management of Property and Construction,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3