The relationship between labour-only procurement and health and safety performance of construction projects

Author:

Umeokafor NnedinmaORCID,Windapo Abimbola,Olatunji Oluwole Alfred

Abstract

PurposeThe purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.Design/methodology/approachUsing non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).FindingsThe findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.Practical implicationsThe study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.Originality/valueThis is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference71 articles.

1. Building information modelling in Cameroon: overcoming existing challenges;International Journal of 3-D Information Modeling,2014

2. Management of labour-only contracts in the Nigerian construction industry, bases of award and execution,2003

3. Cost and time performance of traditional-, direct labour-and management-procured public projects in Ondo State, Nigeria;Organization, Technology and Management in Construction: an International Journal,2017

4. Appraising the use of labour-only procurement system for building construction in Nigeria;Organisation, Technology and Management in Construction,2018

5. Labour- only procurement: a veritable surviving strategy for contractors in a challenging economy;Journal of Engineering, Design and Technology,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3