Cost and time performance of traditional-, direct labour- and management-procured public projects in Ondo State, Nigeria

Author:

Aghimien Douglas Omoregie1,Osanyinro Olufemi2,Adegbembo Taiwo Fadeke3

Affiliation:

1. Federal University of Technology Akure Ondo State , NIGERIA

2. B.Tech., Murty International Limited , Suite 308, Midel Centre, Plot 14, Off Oladipo Diya way, Sector Centre D, Gudu, Abuja, Nigeria

3. M.Tech., Department of Quantity Surveying , Federal University of Technology , Akure, P.M.B. 704, Ondo State, Nigeria

Abstract

Abstract Procurement method over time has proven to have significant influence on the successful delivery of construction projects. Making the right decision in the selection of a procurement option to adopt is therefore crucial if a project is to succeed. This study therefore assessed the cost and time performance of selected public building projects procured using traditional, direct labour and management procurement options in Ondo State, Nigeria. A pro forma was used to gather cost and time data from government procuring entities in the state. In addition, a structured questionnaire was used to obtain information from construction professionals in these procuring entities, in order to ascertain the factors influencing the choice of procurement options adopted. The cost and time data gathered were analyzed using percentages and the paired-samples t-test, while those gathered on the factors influencing the choice of procurement options were analyzed using mean item scores and analysis of variance (ANOVA). The results revealed that although there is no significant difference between the initial and final costs of the assessed projects, some measure of cost overrun still exists. In addition, a considerable amount of time overrun was experienced on projects executed using the three different procurement options. The most significant factors influencing the choice of a procurement option are price competition, speed, time certainty and complexity of the project. It is believed that the findings of this study will provide public procuring entities with insight on the cost and time capability of these procurement methods and aid them in selecting the procurement option that will help in delivering public building projects within the budget and on schedule.

Publisher

Walter de Gruyter GmbH

Subject

Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering

Reference48 articles.

1. Adenuga, O. A. (2013). Comparison of the performance of traditional and direct labour methods of project procurement: A case study of some selected projects of the Nigerian army. Ethiopian Journal of Environmental Studies and Management, 6(1), pp. 12–30.

2. Afriyie, B. B. (2014). Factors influencing the selection of procurement methods for construction works in Ghana. A Thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in Procurement Management, Kwame Nkrumah University of Science and Technology.

3. Aghimien, D. O., & Awodele, O. A. (2017). Variability of cost and time delivery of educational buildings in Nigeria. International Journal of Built Environment and Sustainability, 4(3), pp. 156–164.

4. Aghimien, D. O., Awodele, O. A., Adegbembo, T. F., & Olatunji, S. O. (2017). Cost performance of educational buildings in Ondo State, Nigeria. In: Environmental Design and Management International Conference (EDMIC), 22–24 May, Obafemi Awolowo University, Ile-Ife, Nigeria, pp. 298–307.

5. Akindoyeni, A. (1989). The management of abandoned projects. Journal of the Nigerian Institute of Building, Maiden edition, 1(2), pp. 16–20.

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3