Risk-based integrated performance assessment framework for public-private partnership infrastructure projects

Author:

Fatima Anam1,Mubin Sajjad1,Masood Rehan2

Affiliation:

1. Department of Architectural Engineering & Design, Faculty of Civil Engineering, University of Engineering and Technology , Lahore , Pakistan

2. Ako Delivery—Region Four: Construction Services Team, College of Engineering, Construction and Living Sciences, department of Construction, Otago Polytechnic, Te Pūkenga , Dunedin , New Zealand

Abstract

Abstract Public-private partnerships (PPPs) play a pivotal role in global infrastructure development, significantly impacting economic growth. However, a notable research gap exists in addressing risk management adequately within the performance assessment of PPP projects, particularly in developing nations like Pakistan. This study aims to address this gap by developing an integrated performance assessment framework (IPAF) in order to fill the deficiency of structured risk management in PPP project evaluations. Therefore, the purpose of this study is to devise a systematic methodology for assessing PPP project performance, with a keen emphasis on robust risk management criteria. Employing a comprehensive approach, the methodology integrates 16 performance measures (PMs) aligned with key performance indicators (KPIs), covering the triple constraints of projects (cost, time and quality) during the project feasibility, execution and operation and maintenance phases of project life cycle. Additionally, it incorporates an analysis of 10 prominent risks, spanning financial, environmental, operational, construction, legal and governmental dimensions inherent to PPP projects. The IPAF not only identifies these risks but also offers calculated mitigation strategies to enhance overall project performance. Emphasising alignment with project objectives, stakeholder engagement and contextual factors, the framework aids decision-makers, project managers and policymakers in making informed decisions throughout the project lifecycle. Furthermore, this study contributes by providing a systematic approach to address the critical bond between risk management and project performance in PPP projects. By bridging this gap, the IPAF fosters enhanced project outcomes, thereby contributing to the advancement of infrastructure development practices in both developed and developing contexts.

Publisher

Walter de Gruyter GmbH

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3