A multiproject scheduling and resource management model in projects construction

Author:

Cheraghi Esmail,Zohrehvandi Shakib,Vanhoucke Mario,Mohamadpour Tosarkani Babak

Abstract

PurposeThis research presents a multiproject scheduling and resource management (MPSRM) model that includes an M/M/c/n queue system, a p-hub median model, a parallel machine scheduling and a hub location problem solution method. This research aims to design a project network and then sequence raw materials delivery to hub factories.Design/methodology/approachThis research is implemented as a case study in construction and industrial company. It considers several mines to supply raw materials for production in hub factories. In the sequencing phase, a parallel mine scheduling problem specifies the delivery of raw materials to hub factories. Furthermore, a multisource project scheduling model is studied and designed for building project-oriented companies.FindingsThe results suggest that the proposed MPSRM model in this study significantly reduces project transportation costs. Therefore, creating accurate planning in projects, especially in construction projects where transportation plays an important role, can help reduce time and costs. Researchers, project managers and those dealing with projects can use this model to exploit their projects.Research limitations/implicationsWhen the number of construction projects in a construction company increases in a region, choosing an appropriate strategy to supply resources and raw materials becomes very important in terms of profit and loss and project completion as scheduled. An increase in transportation demands alongside the economic development on the one hand and providing competitive transportation services, on the other hand, have increasingly spotlighted the significance of hub networks in transportation systems. In addition, in this research, there is no suitable access road from the mines to the project sites, and considering the workload, if any of the projects become a hub, a proper road should be built.Originality/valueTo the best of the knowledge, there is no outstanding research in which a p-hub median location problem by considering queuing model and different transportation modes and a parallel machine scheduling problem are studied simultaneously.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3